As part of the Barreiro Velho urban renewal project, CJR upgraded Rua Miguel Bombarda between the tunnel exit and the intersection with Avenida Alfredo da Silva. The project included upgrades to the water supply, sanitary sewer, and stormwater drainage networks, as well as work on power, street lighting, telecommunications, and natural gas infrastructure.
At street level, the work included paving with granite slabs and blocks, installing street furniture, and improving landscaped areas. CJR phased the work to maintain access and allow local businesses to stay open during construction.