On the ER206, CJR built a road tunnel and two reinforced concrete underpasses. Reinforced concrete slabs were supported by pile walls, which also retained the surrounding soil during excavation.
The new layout separated through traffic from local traffic. Vehicles traveling between the A11 and the Creixomil Bypass can now pass beneath the roundabout, which continues to serve local traffic at street level. The work formed part of a wider project to improve road access to Avepark.